Methodology and sources

All figures were read from the sources below on October 20, 2026. Nothing on the site is estimated by the site itself: every number is either quoted from a source or computed from quoted numbers with the formulas on this page.

Sources

DataSourceChecked
Asphalt 3-tab shingles: $3–$5 per sq ftHomeGuide: Roof replacement cost (Nov 7, 2025)2026-10-20
Architectural asphalt shingles: $4–$6 per sq ftHomeGuide: Roof replacement cost (Nov 7, 2025)2026-10-20
Metal roofing: $5–$16 per sq ftHomeGuide: Roof replacement cost (Nov 7, 2025)2026-10-20
Roof replacement labor: $1.50–$3 per sq ftHomeGuide: Roof replacement cost (Nov 7, 2025)2026-10-20
Tear off the old roof: $1–$5 per sq ftHomeGuide: Roof replacement cost (Nov 7, 2025)2026-10-20
Vinyl siding: $4–$12 per sq ftHomeGuide: Siding cost (Oct 29, 2025)2026-10-20
Fiber cement siding: $6–$15 per sq ftHomeGuide: Siding cost (Oct 29, 2025)2026-10-20
Engineered wood siding: $7–$12 per sq ftHomeGuide: Siding cost (Oct 29, 2025)2026-10-20
Cedar siding: $6–$16 per sq ftHomeGuide: Siding cost (Oct 29, 2025)2026-10-20
Siding replacement labor: $2–$6 per sq ftHomeGuide: Siding cost (Oct 29, 2025)2026-10-20
Remove the old siding: $0.70–$2 per sq ftHomeGuide: Siding cost (Oct 29, 2025)2026-10-20
Pressure-treated pine deck: $25–$50 per sq ftHomeGuide: Cost to build a deck (Feb 10, 2026)2026-10-20
Cedar deck: $30–$47 per sq ftHomeGuide: Cost to build a deck (Feb 10, 2026)2026-10-20
Composite deck: $40–$80 per sq ftHomeGuide: Cost to build a deck (Feb 10, 2026)2026-10-20
Deck building labor: $11–$22 per sq ftHomeGuide: Cost to build a deck (Feb 10, 2026)2026-10-20
Wood fence: $20–$50 per linear ftHomeGuide: Fence installation cost (Feb 3, 2026)2026-10-20
Vinyl fence: $30–$60 per linear ftHomeGuide: Fence installation cost (Feb 3, 2026)2026-10-20
Chain-link fence: $9–$30 per linear ftHomeGuide: Fence installation cost (Feb 3, 2026)2026-10-20
Aluminum fence: $25–$75 per linear ftHomeGuide: Fence installation cost (Feb 3, 2026)2026-10-20
Fence installation labor: $5–$15 per linear ftInch Calculator: Cost to install a fence (updated Jul 7, 2023)2026-10-20
Remove the old fence: $10–$20 per linear ftHomeGuide: Fence installation cost (Feb 3, 2026)2026-10-20
Asphalt driveway: $5–$12 per sq ftHomeGuide: Asphalt driveway cost (May 28, 2025)2026-10-20
Concrete driveway: $6–$15 per sq ftHomeGuide: Concrete driveway cost (Jun 3, 2025)2026-10-20
Gravel driveway: $4–$10 per sq ftHomeGuide: Gravel driveway cost (Dec 18, 2025)2026-10-20
Remove the old driveway: $2–$6 per sq ftHomeGuide: Concrete driveway cost (Jun 3, 2025)2026-10-20
Ducted air-source heat pump: $10,000–$25,000HomeGuide: Heat pump cost (Oct 30, 2025)2026-10-20
Ductless mini-split heat pump: $2,000–$17,000HomeGuide: Heat pump cost (Oct 30, 2025)2026-10-20
Heat pump installation labor share (40–60%, 50% used)Filterbuy: Heat pump installation cost guide (Mar 4, 2026)2026-10-20
Regional benchmark (not an input)Remodeling / JLC, Cost vs Value 2025 (national and New England job costs)2026-10-20
Median hourly wage, roofers (47-2181)O*NET OnLine, Roofers (47-2181.00), New Hampshire local wages2026-10-20
Median hourly wage, carpenters (47-2031)O*NET OnLine, Carpenters (47-2031.00), New Hampshire local wages2026-10-20
Median hourly wage, construction laborers (47-2061)O*NET OnLine, Construction Laborers (47-2061.00), New Hampshire local wages2026-10-20
Median hourly wage, paving, surfacing and tamping equipment operators (47-2071)O*NET OnLine, Paving, Surfacing, and Tamping Equipment Operators (47-2071.00), New Hampshire local wages2026-10-20
Median hourly wage, cement masons and concrete finishers (47-2051)O*NET OnLine, Cement Masons and Concrete Finishers (47-2051.00), New Hampshire local wages2026-10-20
Median hourly wage, HVAC mechanics and installers (49-9021)O*NET OnLine, Heating, Air Conditioning, and Refrigeration Mechanics and Installers (49-9021.00), New Hampshire local wages2026-10-20
Wage areas and their countiesBLS, May 2025 Metropolitan and Nonmetropolitan Area Definitions2026-10-20
Barnstead permit fees (amended 8/29/2017 and 10/16/2025 (driveways))Town of Barnstead Building Inspection Fees, Residential Permit Fee Schedule2026-10-20
Bow permit fees (effective March 1, 2024)Town of Bow, Permit Fee Schedule2026-10-20
Conway permit fees (application dated 3.18.2025)Town of Conway Residential Building Permit Application, Permit Fees (pg. 10)2026-10-20
Durham permit fees (effective December 16, 2025)Town of Durham, Fees - Permits and Inspections2026-10-20
Exeter permit fees (revised 01/01/2024)Town of Exeter Building Department Fee Schedule2026-10-20
Fitzwilliam permit fees (no date printed)Town of Fitzwilliam, Schedule of Fees (Building Permit Fee Schedule)2026-10-20
Goffstown permit fees (effective August 13, 2018)Goffstown Building Department Fee Schedule2026-10-20
Hudson permit fees (§ 205-2 amended 10-12-2021)Town of Hudson Code, Chapter 205 Fees, § 205-2 Building fees2026-10-20
Lebanon permit fees (amended 12-1-2021 by Ord. No. 2021-17)City of Lebanon Code, Chapter 36 Building Construction, § 36-3A residential base fees2026-10-20
Londonderry permit fees (effective 11/4/25)Town of Londonderry Building Department, Permitting Fee Schedule2026-10-20
Manchester permit fees (adopted July 6, 2021)Building Code of the City of Manchester, Sec. 109.8 Fee Schedule; Heating Permit application2026-10-20
Merrimack permit fees (effective January 1, 2025)Town of Merrimack, NH Code Enforcement & Inspection Fee Schedule2026-10-20
New Ipswich permit fees (effective February 7, 2022)Town of New Ipswich, Building Fees (Residential and Commercial Construction)2026-10-20
Newbury permit fees (effective January 2, 2026)Town of Newbury, Building Fees Schedule2026-10-20
Newport permit fees (2024 schedule (no effective date printed))Town of Newport, Residential Permit Application Fee Schedule2026-10-20
Portsmouth permit fees (no effective date shown)City of Portsmouth, Building Permits Fee Schedule2026-10-20
Rochester permit fees (no date shown)City of Rochester, Permits2026-10-20
Salem permit fees (effective 1/1/2025, adopted 10/2024)Salem Fire Department, Inspectional Services, Permit Schedule2026-10-20
Somersworth permit fees (no date shown)City of Somersworth, How much do permits cost?2026-10-20
Town population 2010, 2020, 2025; density; group quartersNH Office of Planning and Development, 2025 Population Estimates of New Hampshire Cities and Towns (published July 17, 2026)2026-10-20
Owner-occupied rate, median home value (ACS 2020-2024)U.S. Census Bureau QuickFacts (American Community Survey 2020-2024), one page per town2026-10-20

Formulas

National range. low = material low price per unit × size; high = material high price × size. Heat pumps: a ducted system takes the guide's row for the home size (rounded up to the next listed size); a ductless system takes the guide's single range.

Labor index. factor = median hourly wage of the trade in the town's BLS wage area ÷ US median for that trade. Where BLS publishes no figure for the area, the New Hampshire statewide median is used, and the page says so. Trades: roofers (roof), carpenters (siding, deck), construction laborers (fence), paving equipment operators (asphalt and gravel driveways), cement masons (concrete driveways), HVAC mechanics (heat pumps).

Local estimate. local low = national low + labor low × (factor − 1); same for high. Labor low/high is the guide's labor dollars per unit × size, or its stated labor share × the installed price (gravel driveway 50%; heat pump 50%, the middle of the 40–60% the source gives). Removal, where offered, is all labor: removal price per unit × size × factor. The midpoint is the average of low and high. Shown figures are rounded to $10 below $1,000 and to $50 above.

Permit fee. The town's own published line, applied to the midpoint estimate (or the area in square feet where the town charges by area). A page marks whether the schedule names the work or whether the town's general residential rate is applied. Minimums, application fees, rounding and surcharges are applied as the schedule states them.

What is left out

Roof: tile, slate, wood shake, flat. Left out of the launch set; asphalt and metal cover most New Hampshire re-roofs and the guide's wood-shake figures contradict each other ($7–$15 in the table, $25–$30 in the text).

Fence: composite, wrought iron. Rarely quoted for homes; not in the launch set.

Heat pump: geothermal. Drilling dominates the price and varies by site; no per-unit figure to localize.

Heat pump: federal tax credit. The cost guide still quotes the 25C credit; federal law ended it for equipment placed in service after 2025, so the site does not show it.

Gate, ductwork and add-on items. Fence gates have no stated price in the guide; ductwork ($40–$65 per linear foot) depends on a run length the site cannot know.

Fence erectors (47-4031) as the fence labor index. BLS publishes no New Hampshire area estimate except Boston-Cambridge-Newton; construction laborers (47-2061) are published for every NH area and are used instead.

Nashua, Concord, Dover, Keene, Derry, Laconia, Windham, Pelham, Amherst, Milford, Bedford, Claremont. No current fee schedule with stated amounts could be read on the town's own site on 2026-10-20 (blocked, a form with blank fee fields, a budget document, or a schedule kept in an appendix that is not online). Their towns can still use the calculator through the county option.

Hanover. The fee ordinance found online is the 1996 revision; it could not be confirmed as current.

Meredith. The schedule online is marked as a proposed change (8/21/25).

Holderness, Middleton, Wolfeboro. Schedules were unlabelled, contained an obvious error, or could not be read as text.

Hampton. The search result for a Hampton fee schedule was Hampton, Virginia; the New Hampshire town's schedule was not found.

Town pages without a fee. A town and project get a page only when the town's schedule names the work or sets a general residential rate that covers it. Fences and driveways are rarely on schedules, so few towns have those pages. Every town page still shows labor-adjusted estimates for all six projects.

Other states. The launch covers New Hampshire only. State pages for the rest of the country are not built: the labor index exists for every state, but no town permit data has been collected outside New Hampshire.

Known gaps

Refresh

Cost guides and fee schedules are re-read every six months; wage data each year after BLS publishes the May estimates (usually in spring); population each July when the state publishes its estimates.